- Request
-
The definition of a 'road bridge' in the 'Well-Managed Highway Infrastructure: A Code of Practice' is a structure with a span of 1.5m or more providing public highway passage for motor vehicles over an obstacle such as a watercourse, railway, road, or valley.
The definition of a retaining wall in the same document is a wall associated with the highway where the dominant function is to act as a retaining structure, and with a minimum retained height of 1.35m.
Using these definitions, please provide the following information for all road bridges and retaining walls which you own as highway authority, including those which are jointly owned with another authority, but for which you are the lead authority.
N.B. if your management system is based on an alternative definition (e.g. 0.9m or 1.8m spans for a bridge) you are welcome to provide this data but please indicate clearly what definition you have used.
With climate impacts and extreme weather events becoming more severe, risks to retaining walls may be as significant a problem highway operation and safety as bridges' particularly with respect to their greater numbers. Therefore, this year, whilst we apologise for the increase in the number of questions, we have decided to include retaining walls within the survey to get a good idea of the scale of the risk. (Please answer the questions as best
you can but indicate if accessing the information is a challenge to your management systems).
These Questions All Relate to the Financial Year 2023/2024.
How many road bridges and retaining walls are you responsible for maintaining?
Road bridges/Retaining walls
For the last financial year 2023/24:
How many Principal Inspections have taken place in that year?
i. Road bridges
ii. Retaining walls
How many Principal Inspections did you plan to do in that year?
i. Road bridges
ii. Retaining walls
For the last budget year 2023/24:
How many General Inspections have taken place in that year?
i. Road bridges
ii. Retaining walls
How many General Inspections have taken place in that year?
i. Road bridges
ii. Retaining walls
How many General Inspections did you plan to do in that year?
i. Road bridges
ii. Retaining walls
For the last financial year 2023/24, how many Structural Reviews did you undertake?
How many substandard bridges do you have (in terms of ability to carry 44t vehicles)? Please exclude bridges that have weight restrictions for environmental reasons.
Of these substandard bridges, how many do you intend to return or upgrade to full load carrying capacity in the next 5 years?How many bridges would you return to full load carrying capacity if you had no resource restrictions?
For the last financial year, 2023/24:
How many post-tensioned bridges do you have?
How many of those have had PTSIs within the last 18 years?
Of those that have not had a PTSI, how many require/are due one?
How much funding would you anticipate is required to remove the backlog of PTSIs for those bridges identified in Q6(c)?
In monetary terms, what is the current Depreciation (i.e., difference between your GRC and DRC for 2023/24?
What is the calculated value of your workbank? (Workbank is defined as the total value of condition-based maintenance work that has been identified and can be calculated using SAVI or by other means)
For the last financial year, 2023/24:
What is the annual revenue works expenditure for maintaining your bridge stock (excluding staff costs)?What is the annual capital works budget for maintaining your bridge stock?What total budget would you estimate is required to maintain the bridge stock at its current level (standstill budget)?
For the last financial year, 2023/24:
What was the revenue works budget for maintaining your retaining wall stock (excluding staff costs)?
What was the capital works budget for maintaining your maintaining wall stock?
What total budget would you estimate is required to maintain the retaining wall stock at its current level (standstill budget)?
- Decision
-
I can confirm that the following information is held by Lincolnshire County Council;
- 1534/148 road bridges/retaining walls
2i. Road bridges 91
2ii. Retaining walls 0
3i. Road bridges 109
3ii. Retaining walls 0
4i. 738 – based upon 0.6m span upwards
4ii. 50 retaining walls
5i. 738 – based upon 0.6m span upwards
5ii. 50 retaining walls
6i. 1061 – based upon on 0.6m
6ii. 129 retaining walls
7. 4 structural reviews
8. 4 substandard bridges
9. 0 (very remote end of highway locations – works not viable)
10. 9 post-tensioned bridges
11a. 0
b. 0
12.
a. 0
b. 0
13a. 0
b. 0
c. 0
d. 0
e. Y
14. 0
15. Average 92.3858 / critical = 85.3139 (current)
16. Corrosion of corrugated steel culverts
17. 0 - Reference number
- 11049370
- Date request received
- 22 November 2024
- Date of decision
- 26 March 2025