- Request
-
1) Can you provide (under Freedom Of Information) Data on the most recent Zebra Crossing installed in Lincolnshire on a single carriageway road.
1. The location
2. Date of installation
3. Cost of installation
- Decision
-
I can confirm that the information requested is held by Lincolnshire County Council. I have detailed below the information that is being released to you.
FOI Query
Response for zebra crossing
Response for a pedestrian signalised crossing
- Please can you clarify which location you are seeking information for? The location of the most recent Zebra Crossing installed on a single carriageway road.
The location of the most recent Zebra Crossing on a single carriageway road was at Rectory Road, Ruskington.
The location of the most recent signalised pedestrian crossing on a single carriageway road was at High Street, Skellingthorpe.
- Please can you clarify the timeframe of the construction of the crossing? The Construction date of the most recent Zebra Crossing installed on a single carriageway road.
The timeframe of the construction of the Zebra Crossing was three weeks, installed in 2021.
The timeframe of the construction of the signalised pedestrian crossing on a single carriageway road was five weeks, installed in Autumn 2024.
- Please can you clarify if you require information about a zebra crossing the most recent Zebra Crossing with Belisha Beacons on a single carriageway road or signalized crossing (with a push button) in just one location or across the County.
No response required.
-
- Cost of installation
The construction costs of the installation of the Zebra Crossing was £48,551 (this did not include any new road surfacing as it was not required at the site).
The construction costs of the installation of the signalised pedestrian crossing on a single carriageway road was £360,000 (55% of this cost included new road surfacing which was required at the site).
- Reference number
- 12347013
- Date request received
- 22 May 2025
- Date of decision
- 17 June 2025