I am researching solar photovoltaic (PV) development and wish to make the following request under the Freedom of Information Act.

 

1. On land and building assets that are owned or controlled* by the authority, how much solar PV capacity in kilowatt peak (kWp) has been installed?

 

(*"controlled" means where the authority has management control of a site's facilities and utilities, such as under a long-term lease)

 

I would like the response for this to be separated into four categories:

 

a) Solar PV capacity owned by the authority:

b) Solar PV capacity owned by a community group:

c) Solar PV capacity owned by another party, that is not a community group, where a power purchase agreement (PPA) exists to supply the authority:

d) Any other solar PV capacity owned by another party:

 

If an exact figure for installed solar PV in kWp cannot be obtained, please make an estimate of a minimum value that is known with confidence. For example, 'estimated - at least 100kWp'.

 

2. This question asks for information about procurement of solar PV goods and services in the past three years, where a contract has been awarded between 1 January 2023 and the date of this request.

Could you supply me with the following information please:

 

Procurement route

Select from list

Framework; Dynamic Purchasing System; Open Tender; Restricted Procedure;   Direct Award; Other (Please specify)

1a. If "other", please specify:

2 What was procured

Select from list

 

a) Design, supply and installation of solar PV panels and related equipment (Design and Build); Supply of solar PV panels and related equipment only; Supply and installation of solar PV panels and related equipment

(separate to design work); Installation costs only (separate to supply of equipment or design); Design or advisory services only; Operations and maintenance only;   Other (please specify)

 

2b

If "other", please specify:

Text entry

 

3 Procurement award date

Decision

1.

 

a. 709kWp

b. 0kWp

c. 0kWp

d. 0kWp

 

 

2.

 

a. None Procured.

 

b. Not applicable.

 

3. Not applicable.