- Request
-
1) please provide a breakdown of the total expenditure on road maintenance and 'servicing' (including resurfacing, pothole repairs, and routine maintenance) specifically within the town of Stamford for the financial years 2023/24 and 2024/25.
a) If a specific town-level breakdown is not available, please provide the expenditure for the South Kesteven area with any available data specifically tagged to Stamford-based projects.
b) If this is too broad, please provide details on the expenditure for resurfacing carried out in 2025 in Stamford, specifically Cambridge Road & Edinburgh Road. - Decision
-
1a-b) The total expenditure on road schemes in Stamford for 23/24 was £748,529.66
The total expenditure on road schemes in Stamford for 24/25 was £333,574.12
The above amounts do not include pothole repairs completed or other "reactive" maintenance, drainage cleansing/investigation.
The contractual mechanisms for these aspects of work are such that it is not possible to identify specific costs for certain geographical locations but repairs of this nature are delivered under an overall "reactive" expenditure.
- Reference number
- FOI 15160861
- Date request received
- 21/01/26
- Date of decision
- 10/02/26