Stamford Road Market Deeping

Request

Stamford Road Market Deeping (what tree word location is stir.digits.purchaser)



Please can you send me:

1) A copy of your current road maintenance policy relating to that road. Please send me the full policy, but this should include details of the intended frequency of road safety inspections, how these inspections should be conducted and the maximum time between identification of a defect and repairs being carried out.



2) A copy of the road repair history for that road over the past year. Again, please send me the full road repair history, but this should include:

- dates of all safety inspections between 1/2/2026 and 1/4/2026

- details of how safety inspections were undertaken (walked or driven, speed of inspection vehicle etc)

- details of all carriageway defects identified, with description, date and time

- details of how the authority handled these defects, what repairs were undertaken and the time between the identification of each defect and a repair being carried out.

Decision

1. . Highways infrastructure asset management plan 2026 explains how we manage and maintain the highways.

 

2. Answers in bold - dates of all safety inspections between 1/2/2026 and 1/4/2026 see attached site history report - details of how safety inspections were undertaken (walked or driven, speed of inspection vehicle etc) driven inspection up to 40mph - details of all carriageway defects identified, with description, date and time see attached site history report - details of how the authority handled these defects, what repairs were undertaken and the time between the identification of each defect and a repair being carried out. see attached site history report

Reference number
17049977
Date request received
29 June 2026
Date of decision
27 July 2026