Inspecting and testing the build

Key Build Stage 3 Road sub-base

Road sub-base checks

Evidence

Frequency

Verification including non-frost susceptibility

Tickets

All sources

Check depth of material

Visual

One per 100 tonne

Completed sub-base

Visual

All lengths

Plate Bearing test to assess compaction

Testing

One per 100m (minimum two per site)