Key Build Stage 4 Kerbing
|
Kerbing checks |
Evidence |
Frequency |
|---|---|---|
|
Inspection of kerb/channel races, line, levels and dimensions (Kerb race/bed to be laid separate to backing) |
Visual |
All lengths |
|
Verification that binder course to be laid in two stages if alternative kerbing methods are being utilised |
Visual |
Check in all cases |
|
Inspection of kerb lines and levels |
Visual |
All lengths |
|
Inspection of kerb faces and upstands |
Visual |
All lengths |