Planning application documents

7.1 Planning Application PL/0087/23 11/06/2025 LCC
7.2 Section 73 Planning Application Documents 11/06/2025 LCC

Document ref.

Key evidence and supporting documentation

Date added

Submitted by

Other documents

Outline business case
8.1 NHRR OBC Strategic Case 12/06/2025 LCC
8.2 NHRR Options Appraisal Report 12/06/2025 LCC
8.3 Appendix A - Policy and Strategy Review 12/06/2025 LCC
8.4 Appendix B - Supplementary Traffic Data 12/06/2025 LCC
8.5 Appendix C - Select Link Analysis 12/06/2025 LCC
8.6 Appendix D - Junction Capacity 12/06/2025 LCC
8.7 Appendix E - Environmental Constraints 12/06/2025 LCC
8.8 Appendix F - Objectives and Outcomes 12/06/2025 LCC
8.9 Appendix G - LITS Option Generation Approach 12/06/2025 LCC
8.10 Option for River Witham South Bridge - Dual Carriageway Option 12/06/2025 LCC
8.11 Options for A607 Over-Bridge - Dual Carriageway Option 12/06/2025 LCC
8.12 Options for A607 Over-Bridge 12/06/2025 LCC
8.13 Options for River Witham Bridge 12/06/2025 LCC
8.14 Options for Station Road Over-Bridge – Dual Carriageway Option 12/06/2025 LCC
8.15 Options for Station Road Over-Bridge 12/06/2025 LCC
8.16 Appendix I - Design Workshop Technical Note 12/06/2025 LCC
8.17 Appendix J - Initial Sift 12/06/2025 LCC
8.18 Appendix K - EAST Sift 12/06/2025 LCC
8.19 Appendix L - Traffic Impact Assessment 12/06/2025 LCC
8.20 Appendix M - Options Assessment Framework 12/06/2025 LCC
8.21 Appendix N - NHRR - Engagement Report - Part 1 12/06/2025 LCC
8.22 Appendix N - NHRR - Engagement Report - Part 2 12/06/2025 LCC
8.23 Appendix N - NHRR - Engagement Report - Part 3 12/06/2025 LCC
8.24 NHRR Transport Investment Strategy 12/06/2025 LCC
8.25 NHRR Strategic and Wider Benefits Report 12/06/2025 LCC
8.26 Preliminary Dual Carriageway Plan 1 of 2 12/06/2025 LCC
8.27 Preliminary Dual Carriageway Plan 2 of 2 12/06/2025 LCC
8.28 NHRR Dual Carriageway Option NMU Access Arrangement Sheet 1 of 5 12/06/2025 LCC
8.29 NHRR Dual Carriageway Option NMU Access Arrangement Sheet 2 of 5 12/06/2025 LCC
8.30 NHRR Dual Carriageway Option NMU Access Arrangement Sheet 3 of 5 12/06/2025 LCC
8.31 NHRR Dual Carriageway Option NMU Access Arrangement Sheet 4 of 5 12/06/2025 LCC
8.32 NHRR Dual Carriageway Option NMU Access Arrangement Sheet 5 of 5 12/06/2025 LCC
8.33 NHRR Dual Carriageway Plan 12/06/2025 LCC
8.34 NHRR Dual Carriageway PMA Access Track 12/06/2025 LCC
8.35 NHRR Stakeholder Support 12/06/2025 LCC
8.36 Appendix A - Stakeholder Supporting Letters 12/06/2025 LCC
8.37 Economic Case 12/06/2025 LCC
8.38 NHRR OBC Economic Case 12/06/2025 LCC
8.39 GLTM Local Model Validation Report - Part 1 12/06/2025 LCC
8.40 GLTM Local Model Validation Report - Part 2 12/06/2025 LCC
8.41 GLTM Local Model Validation Report - Part 3 12/06/2025 LCC
8.42 ​​​​​​NHRR Local Model Validation Report Addendum 12/06/2025 LCC
8.43 NHRR Traffic Forecasting Report - Part 1 12/06/2025 LCC
8.44 NHRR Traffic Forecasting Report - Part 2 12/06/2025 LCC
8.45 NHRR Traffic Forecasting Report - Part 3 12/06/2025 LCC
8.46 APPENDIX A - Development Uncertainty and Trip Generation 12/06/2025 LCC
8.47 APPENDIX B - SUE Images 12/06/2025 LCC
8.48 APPENDIX C - NTM GV Factors 12/06/2025 LCC
8.49 APPENDIX D - Development Trip Distribution Gravity Model Calibration 12/06/2025 LCC
8.50 APPENDIX E - Forecast Fixed Speed Factors 12/06/2025 LCC
8.51 APPENDIX F - VDM Sector Impacts 12/06/2025 LCC
8.52 APPENDIX G - Highway Model Convergence 12/06/2025 LCC
8.53 APPENDIX H - Core Scenario Flow Diff Optimized 12/06/2025 LCC
8.54 APPENDIX I - Core Scenario Delay Diff Optimized 12/06/2025 LCC
8.55 APPENDIX J - VDM Convergence 12/06/2025 LCC
8.56 APPENDIX K - Alternative Option Flow Diff Optimized 12/06/2025 LCC
8.57 APPENDIX L - Alternative Growth Flow Diff Optimized 12/06/2025 LCC
8.58 NHRR Economic Appraisal Report 12/06/2025 LCC
8.59 Appendix D - Environmental Appraisal - Part 1 12/06/2025 LCC
8.60 Appendix D - Environmental Appraisal - Part 2 12/06/2025 LCC
8.61 Appendix D - Environmental Appraisal - Part 3 12/06/2025 LCC
8.62 NHRR Economic Impact Report 12/06/2025 LCC
8.63 APPENDIX A - SWQ Land Budget Plan 12/06/2025 LCC
8.64 NHRR Social and Distributional Impacts Report - Part 1 12/06/2025 LCC
8.65 NHRR Social and Distributional Impacts Report - Part 2 12/06/2025 LCC
8.66 NHRR Social and Distributional Impacts Report - Part 3 12/06/2025 LCC
8.67 Commercial case 12/06/2025 LCC
8.68 NHRR OBC Financial Case 12/06/2025 LCC
8.69 NHRR OBC Management Case 12/06/2025 LCC
Section 6 agreement (completed in counterpart)
8.70 Section 6 Agreement – Lincolnshire County Council 12/06/2025 LCC
8.71 Section 6 Agreement – National Highways 12/06/2025 LCC
Scheme documents and drawings
8.72 Ownership Drawing 12/06/2025 LCC
8.73 SuDS Management Plan 12/06/2025 LCC
8.74 Drainage Catchment Drawing 12/06/2025 LCC
8.75 Watercourse strategy drawing Sheet 1 12/06/2025 LCC
8.76 Watercourse strategy drawing Sheet 2 12/06/2025 LCC
8.77 Watercourse stratergy drawing Sheet 3 12/06/2025 LCC
8.78 Existing Overland Catchment and flow direction drawing  12/06/2025 LCC
8.79 Drainage Strategy Report 12/06/2025 LCC
8.80 Water Quality Assessment 12/06/2025 LCC
8.81 Dust Management Plan 12/06/2025 LCC
8.82 (i) Construction Environmental Management Plan (CEMP) - Part 1 12/06/2025 LCC
8.82 (ii) Construction Environmental Management Plan (CEMP) - Part 2 12/06/2025 LCC
8.82 (iii) Construction Environmental Management Plan (CEMP) - Part 3 12/06/2025 LCC
8.83 Landscape and Ecology Management Plan (LEMP) 12/06/2025 LCC
8.84 Biodiversity Net Gain report 12/06/2025 LCC
8.85 Walking, Cycling and Horse-Riding Assessment and Review 12/06/2025 LCC
8.86 The Soil Management and Land Reinstatement Plan 12/06/2025 LCC
8.87 Bird Hazard Management Plan 12/06/2025 LCC
8.88 Materials Management Plan 12/06/2025 LCC
8.89 Trial Trenching Assessment Report (NHRR-TEP-HER-HYKE-RP-LH-30004) 12/06/2025 LCC
8.90 Archaeological Geophysical Survey (NHRR-TEP-HER-HYKE-RP-LH-30000) 12/06/2025 LCC
8.91 Planning Statement (NHRR-TEP-GEN-HYKE-RP-TP-00001 P3.1) ‘Supporting Statement’) 12/06/2025 LCC
8.92 Written Scheme of Investigation, Archaeological Works (NHRR-TEP-HER-HYKE-RP-LH-30006) 12/06/2025 LCC
8.93 Figure 8.3 Landscape Character District and Local Landscape Character Areas 12/06/2025 LCC
8.94 Figure 8.6 Zone of Theoretical Visibility Heavy Goods Vehicles 12/06/2025 LCC
8.95 Figure 8.7 Zone of Theoretical Visibility Small Vans 12/06/2025 LCC
8.96 Figure 8.8 Zone of Theoretical Visibility Lighting Columns 12/06/2025 LCC
8.97 Figure 8.9 - Viewpoint Location 12/06/2025 LCC
8.98 (i) Hydraulic Modelling Report - Part 1 12/06/2025 LCC
8.98 (ii) Hydraulic Modelling Report - Part 2 12/06/2025 LCC
8.98 (ii) Hydraulic Modelling Report - Part 3 12/06/2025 LCC
8.98 (iv) Hydraulic Modelling Report - Part 4 12/06/2025 LCC
8.98 (v) Hydraulic Modelling Report - Part 5 12/06/2025 LCC
8.99 Flood Risk Assessment 12/06/2025 LCC
8.100 Hydromorphology Assessment 12/06/2025 LCC
8.101 Water Framework Directive Assessment 12/06/2025 LCC
8.102 Initial Scour Assessment and Optioneering 12/06/2025 LCC
8.103 Stage 1 Road Safety Audit 12/06/2025 LCC
8.104 Model Specification Report (GLTM) 2017 12/06/2025 LCC
8.105 Model Specification Report (GLTM) 2023 12/06/2025 LCC
8.106 Model Validation Report (GLTM2) 2024 12/06/2025 LCC
8.107 Model Validation Report (GLTM2) appendices 2024 12/06/2025 LCC
8.108 Main scheme Road Safety Audit 2 12/06/2025 LCC
8.109 A46 Repeat Stage 1 Road Safety Audit  12/06/2025 LCC

Document ref.

Key evidence and supporting documentation

Date added

Submitted by

Objections

9.1 Mrs Smith and Mrs Garfoot 10/06/2025 Garfoot
9.1(i) Mrs Smith and Mrs Garfoot - Removal of Objection 10/06/2025 Mrs Smith and Mrs Garfoot
9.2 National Grid 10/06/2025 National Grid
9.2(i) National Grid - Removal of Objection 12/06/2025  
9.3 Rontec 10/06/2025 Rontec
9.4 Lilly 10/06/2025 Lilly
9.5 Mrs Burgess 10/06/2025 Mrs Burgess
9.6 Quay Bronze Ltd. 10/06/2025 Quay Bronze Ltd
9.7 TL Propco1 Ltd. 10/06/2025 TL Propco1 Ltd
9.8 Mr O'Boyle 10/06/2025 Mr O'Boyle
9.9 Travelodge 10/06/2025 Travelodge Ltd.
9.10 Mr and Mrs James 10/06/2025 Mr and Mrs James
9.11 Network Rail 10/06/2025 Network Rail
9.12 Wolfson Trago 10/06/2025 Wolfson Trago

Document ref.

Key evidence and supporting documentation

Date added

Submitted by

LCC Proofs of evidence

10.1 LCC 01 - Sam Edwards 10/06/2025 LCC
10.2 LCC 02 - Adam Lakin 10/06/2025 LCC
10.3 LCC 03 - Barry Williams 10/06/2025 LCC
10.3(i) LCC 03(i) - Moneeb Munir 10/06/2025 LCC
10.3(ii) LCC 03(ii) - Richard Bradley 10/06/2025 LCC
10.4 LCC 04 - Ian Turvey 10/06/2025 LCC
10.5 LCC 05 - Ian Grimshaw 10/06/2025 LCC
10.5(i) LCC 05(i) - Alice McLean 10/06/2025 LCC
10.5(ii) LCC 05(ii) - Dan Doherty 10/06/2025 LCC
10.5(iii) LCC 05(iii) - Jason Clarke 10/06/2025 LCC
10.6 LCC 06 - Louise Fitzgerald 10/06/2025 LCC
10.7 LCC 07 - Liz Seal 10/06/2025 LCC
10.8 LCC 08 - Sarah Armitt 10/06/2025 LCC
10.9 LCC 09 - Rachel Jones 10/06/2025 LCC

Document ref.

Key evidence and supporting documentation

Date added

Submitted by

LCC Response to objections

11.1 Letter to Sam Elkington dated 12 December 2024 (in respect of Mrs Smith and Mrs Garfoot) 10/06/2025 LCC
11.2 Letter to Henry Church dated 23 December 2024 (in respect of Rontec) 10/06/2025 LCC
11.3 Letter to Geoffrey Bishop dated 22 January 2025 (in respect of Lilly) 10/06/2025 LCC
11.4 Letter to Geoffrey Bishop dated 22 January 2025 (in respect of Mrs Burgess) 10/06/2025 LCC
11.5 Letter to Andrew Prowse dated 23 December 2024 (in respect of Quay Bronze Ltd.) 10/06/2025 LCC
11.6 Letter to Andrew Prowse dated 7 January 2025 (in respect of TL Propco1) 10/06/2025 LCC
11.7 Letter to Andrew Prowse dated 23 December 2024 (in respect of Mr Colin O'Boyle) 10/06/2025 LCC
11.8 Letter to Andrew Prowse dated 7 January 2025 (in respect of Travelodge) 10/06/2025 LCC
11.9 Letter to Andrew Prowse dated 14 January 2025 (in respect of Mr and Mrs James) 10/06/2025 LCC
11.10 Letter to Tim Hancock dated 16 January 2025 (in respect of Wolfson Trago) 10/06/2025 LCC